FIRST-CLASS MINING ATTACHMENTS
Supply Dual cable reeler to Vale Carajas – Brazil – (Sotreq)
Category:
31 August, 2022

A Dual Reel was supplied to Vale Carajas in July. The equipment was installed on the front loader and has a 6.5 metre long arm, a 450 metre cable reel, which is used to guide and move electrical cables in the mine.