FIRST-CLASS MINING ATTACHMENTS
Supply Dual cable reeler to Cerrejon mine – Colombia – (Incomaq)
Category:
31 August, 2022

A Dual Reel was supplied to Cerrejon mine in april. The equipment was installed on the front loader and has a 7.0 metre long arm, a 600 metre cable reel, which is used to guide and move electrical cables in the mine. 4 equipment have been supplied.